Demolition of 14 storey RC framed structure in the grounds of the Royal Liverpool University Hospital and within 14 metres of occupied creche.
Demolition of 3 blocks of 16 – 17 storey flats in residential area using ultra long reach plant.
Part of UoL Engineering Restructuring Project: Demolition of two storey office building spanning 30 metres across plaza / railway.
Part of UoL Engineering Restructuring Project: level by level reduction in height of 11 storey block of offices / laboratories on very confined site, over retained and protected floors.
Hand demolition of 46 metre high reinforced concrete chimney within operational university campus.
Part of UoL Engineering Restructuring Project: major enabling works to strip offices, lecture theatres, laboratories, circulation areas back to structure, ready for follow on restructuring.
Part of UoL Engineering Restructuring Project: Design and installation of temporary works to form major openings in walls and floors of retained buildings.
Fast track enabling works project for conversion of a nine storey department store.
Demolition, clearance and reclamation of 6 acre industrial site.
Demolition of 27 acre industrial complex formerly operated by messrs GEC.
Facade retention, materials salvage and demolition of complex of Victorian warehouse and shops in very dangerous condition.
Demolition of redundant RC access bridge crossing a major arterial road, linking a residential estate with a busy shopping centre.
Demolition of car park within live shopping centre.
Asbestos Removal and demolition of 18 storey block of flats by the controlled use of exposives.
Asbestos Removal and demolition of two blocks of 14 storey flats from a group of three, using combination of floor by floor and long reach methods.
Demolition of multispan steel framed enclosed bridge structure crossing operational process plant,’A’ road and main railway line.
Demolition of major multistorey office complex in busy city centre location.
Demolition of factory complex on prominent site, shared with Rolls Royce Gas Turbine production facility.
Dismantling of process plant within operational factory complex.
Dedicated recycling centre, with capacity of 120,000 tonnes , producing quality recycled aggregates for construction.
Site clearance, remediation and construction of 10,000 sq metres of hardstandings and concrete storage aprons.
Asbestos removal, demolition and site remediation to two blocks of 16 storey flats.